Lackawanna Cut-Off Rehabilitation (Roseville Tunnel) - December 13, 2024
ALL ABOARD
---------------------------------------
For this last update of 2024, you will see that lighting is now
For this last update of 2024, you will see that lighting is now
being added inside the tunnel as well as additional electrical conduit.
The roadbed is complete except for the ballast, ties, and track, and the
full length of the tunnel is easily walkable from one portal to the other.
Looking west at Roseville Tunnel. All heavy construction equipment has been removed from this portal. |
Looking west. Notice the new electrical conduits embedded in the concrete tunnel lining on the left (south side) of the tunnel. |
Looking west |
This type of light is being installed throughout the tunnel, each with its own electrical conduit access panel. |
Looking west |
Looking west. Notice the pristine roadbed, ready for the ballast, ties, and track. |
Looking west |
Looking back towards the east portal. Notice the new electrical conduit on the left (north side) of the tunnel |
Looking back towards the east portal. Notice the electrical conduit on the south side of the tunnel is embedded in the concrete tunnel lining. |
Looking west towards Colby Cut |
Electrical conduit work running from the base of the west portal up to the top of the tunnel, adjacent to Johnson Park. |
Looking west along Colby Cut with much construction equipment ready to be added to the tunnel. |
--------------------------------------
Stay tuned for more updates as
the construction/rehab progresses
I hope you enjoyed the views
Wishing everyone a Merry Christmas
and a Happy & Healthy New Year !!!