Roseville Tunnel (East and West Portals - Tunnel Lining Started) - October 24, 2023...

  ALL ABOARD !

My first stop was the Roseville Road bridge over the Cut-Off for splendid views of the Roseville Tunnel and all the happenings around it.  I then drove to adjacent Johnson Park and was going to check-out Colby Cut from above when I saw many workers atop both sides of the cut near the west portal of the Tunnel.  I then decided to walk directly over the length of the tunnel to the east portal, where I spent some time shooting pictures of not only the new rock cliff netting, but also of the concrete tunnel-lining operations down below.

I then walked back over the tunnel to the top of the west portal, noting workers atop the north side of Colby Cut.  There was a lot of smoke/dust as well as water spray generated by drilling operations within the Colby Cut.  My guess is that these will be for the anchors that will secure the rock cliff netting in place, just as was done on the east portal.  Again, just a guess...

---------------------------------------

The first (5) pictures are of the west portal of Roseville Tunnel 






---------------------------------------
The next (17) pictures are of the east portal of Roseville Tunnel



















---------------------------------------
The last (11) pictures are of the west portal of Roseville Tunnel, looking out towards the Roseville Road bridge.












                                    I hope you enjoyed the views !