Lackawanna Cut-Off Rehabilitation (Roseville Tunnel area) - May 1, 2024
ALL ABOARD !
---------------------------------------
![]() |
| Looking west from atop the Roseville Tunnel |
![]() |
| Atop the west portal of the tunnel, looking towards Johnson Park |
---------------------------------------
The remainder of the photos are all at railbed level,
at the east portal of the tunnel
![]() |
| Looking east from just a ways past the east portal |
---------------------------------------
---------------------------------------
![]() |
| A drainage ditch has now been dug |
![]() |
| Giant banana peels plastered on the inner walls of the tunnel 😛 |
![]() |
| This looked really creepy whilst walking towards it and not knowing what I was seeing until I got a closer look. Here the seams on this half portion are not yet joined. |
![]() |
| It looks like there's still over half the length of the tunnel to line with this yellow water barrier |
![]() |
| And this is where I turned around. You can see the rolls of Yellow Liner leaned up against the wall just waiting to be installed |
---------------------------------------
This last group of photos is once again
This last group of photos is once again
looking east out of the tunnel
![]() |
| That liner produced some interesting effects |
![]() |
| I like how the beautiful sky is framed in the yellow-lined tunnel |
![]() |
| Rolls of the yellow lining material sitting at the east portal |
![]() |
| This is a more detailed look at the yellow lining material |
![]() |
| I emerge from the darkness |
![]() |
| Stopping by the tunnel this afternoon to check on progress was well worth it I hope you enjoyed the views ! |



























Comments
Post a Comment